The Eckhof 2 was built in cooperation with the Fink engineering firm. All stalls, paddock panels and the feeding house with swivelling feeding stands were manufactured by Hau. The beautiful setting and numerous innovative details make this project special. (http://www.pferdelaufstall-eckhof.de)
Completion: spring 2006
Planer: Georg W. Fink
Scope of delivery: 28 Partner stalls, paddock sections, roofed swivelling feeding stand
Specials:
- 2 x 20 feeding stand separators in the rear, swivelling for machine-supported mucking
- Custom-made stall front design
- Reinforced load-bearing poles for paddocks
- Fully swivelling paddock sections






